Cardington Waterline Replacement Project, Phase I & II

Cardington Waterline Replacement Project, Phase I & II

Client: Village of Cardington
Location: Cardington, Ohio

Description:
KEM completed a Village wide study of the existing potable water distribution system to determine a plan of action for the replacement of their aging water mains and hydrants. Also included with this study was an analysis of the pressures measured throughout the distribution system along with recommendations of how to gain additional pressure through looping and other options. Once the study was complete the Village authorized moving forward with Phases 1 and 2. Phase 1 was completed in 2005 and Phase 2 is currently being bid. KEM services included the preparation of construction plans, bid documents, grant applications, and easements; KEM also provided construction administration and as built drawings. The two phases encompassed the replacement and looping of 14,300 feet of 8" water main along with 30 fire hydrants.



K.E. McCartney & Associates, Inc.   |   Mansfield, Ohio   |   Elyria, Ohio   |   Weirton, West Virginia