Bascom Collection System

KEM was hired by Seneca County to complete and implement a general plan for sewage improvements to satisfy an Ohio EPA “Findings and Orders” stating that the current on-site sewage treatment systems were inadequate or failing and discharging untreated or partially treated sewage to roadside ditches and the storm water system. KEM prepared an engineering study evaluating alternative wastewater collection and treatment systems of which a gravity collection system was the preferred alternative that included new pump stations and collection system piping.

Sample Projects