As part of the Project Team for the Rocky River Stormwater Master Plan, KEM is conducting remote and physical walk-through CCTV inspections of approximately 30,000 linear feet of culverted streams which have both small and large diameter storm sewers. KEM is inspecting the culverted streams using NASSCO PACP coding.