This project involved the construction of a new storm sewer system along Third Street, starting at the intersection of West 2nd Street and extending south to the intersection of Washington Street. The project was designed to improve drainage along Third Street, which had been a problem for many years. Approximately 1,850 linear feet of storm sewer, ranging in size from 12″ to 30″, along with 23 drainage structures were installed as part of the improvements.