Project Bids

Marion County Grave Creek Interceptor Sewer Rehabilitation Project

The project consists of cleaning, televising, and cured-in-place lining of approximately 17,344 linear feet of 18” through 36” diameter sanitary sewer including bypass pumping required to install the liner. Additionally, 55 sanitary manholes are to be rehabilitated along the interceptor sewer.

Bids close at 9:15 AM, local time, Thursday, December 12, 2024.

Click Here for Details

Abbe Road Signal at Ford, OPWC Project 2024

The Sheffield Village project includes the construction of a permanent traffic signal at Ford’s OHAP Truck Entrance on Abbe Road. The project will also remove traffic signals and driveways at Ford’s existing No. 2 and No. 3 driveways. Pavement marking work is also included in the project.
Bids close at 10:00 AM, local time, Thursday, December 5, 2024.

Click Here for Details

SD7 Marion South Pump Station Rehabilitation

The Marion County SD7 Marion South Pump Station Rehabilitation Project consists of replacing two (2) existing submersible pumps and their appurtenances, replacement of electrical and controls along with addition of new generator. Replacement pumps shall include submersible pumps with base assemblies, guide rails, drive units, motors, anchors, electrical and control panels, and other appurtenances as specified or required for a complete installation.
Bids close at 9:15 AM, local time, Thursday, November 21, 2024.

Click Here for Details