Project Bids

Village of Crestline – Kelly Park Slope Improvements Project

The Village of Crestline – Kelly Park Slope Improvements Project contains 1,153 feet of channel bank improvements for Paramour Creek in Kelly Park within the Village of Crestline.   The work consists of clearing and grubbing, rock channel protection slope protection, bank grading and erosion control. The estimated cost of the construction is $189,000.00.  The Owner intends and requires that this project be completed by November 30, 2026.

Bids close Wednesday, July 1, 2026, at 12:00 pm (Noon), local time.

Click Here for Details

Village of Crestline – Kelly Park Pedestrian Bridge Project

The Village of Crestline – Kelly Park Pedestrian Bridge Project consists of furnishing and installing a pedestrian bridge over Paramour Creek in Kelly Park within the Village of Crestline.  The bridge and abutments shall be designed by an Ohio Registered Professional Engineer contracted by the contractor and stamped drawings shall be provided.  Other project work consists of approach sidewalks, rock channel protection slope protection, minor bank grading, and erosion control.  The estimated cost of the construction is $222,000.00.  The Owner intends and requires that this project be completed by November 30, 2026.

Bids close Wednesday, July 1, 2026, at 12:00 pm (Noon), local time.

Click Here for Details

City of Ontario: 2026 Sanitary Sewer Rehabilitation

The project includes the installation of approximately 2,666 LF of 8-inch cured-in-place pipe (CIPP) liner for sanitary sewer mains along with the CIPP lining and reinstatement of 22 sanitary sewer service laterals up to the right-of-way. The sanitary sewer service laterals consist of approximately 694 LF of 6-inch pipe. The estimated cost of construction is $280,125.00.

Bids close Thursday, June 25, 2026, at 10:00:00 AM, local time.

Click Here for Details