KEM provided a preliminary study to analyze storm sewer layouts, sizing, and detention options along with associated cost estimates. Following the study, KEM provided design services including survey, final design, construction plans, construction project manual, and cost estimates. The project included approximately 2,200 feet of 12″ to 24″ storm sewer, a detention basin, 2,300 feet of pavement underdrains, 2,350 feet of curb replacement, and 6,560 square feet of sidewalk replacement.