KEM was selected to perform flow monitoring throughout the City of Mansfield sanitary sewer collection system. The City was divided into flow basins, and flow meters/rain gauges were installed to determine the flows in each basin. Flow monitoring was completed and utilized to model of the collection system. The flow data was also utilized to determine areas to focus I/I rehabilitation efforts.