Bellville Water Evaluation and Waterline Replacement
KEM developed a model of the entire Village of Bellville water distribution system, resulting in a list of recommended improvement projects. The system-wide model revealed that the northeast portion of the Village had very low pressures, in addition to low fire flows throughout the Village, due to a number of small diameter water lines. KEM completed the design, bidding, and construction management of the first of four phases of the improvements, which included the installation of a new 12-inch water main that serves as the new “backbone” of the entire water distribution system.