KEM developed a model for three separate areas of the City where water main extensions were planned to occur. KEM surveyed the areas and developed construction plans for the replacement of these aging and undersized waterlines, along with looping of the system to increase fire flows. The project consisted of new 8-inch ductile iron water main, new fire hydrants, and the replacement of all service lines to the right-of-way along the length of the project.