Spring 2025 Newsletter

Nine stories

A Message from Brian and Staff

Spring Into Engineering Excellence With KEM!

As the season of fresh starts is upon us, we’re here to pave the way—quite literally and figuratively! This edition of our KEM Newsletter is packed with updates, insights, and even a sprinkle of fun. From the streets of Mansfield to the scenic trails of Holmes County, our projects are making waves and reshaping our communities. Plus, meet an inspiring intern, decode some engineering jargon, and join us for a taste of something delicious in “Cooking with KEM.” Let’s dive into all the exciting happenings that make KEM a cornerstone of innovation and community impact!

Project Spotlight

Holmes County Trail Phase 5C1

Project Overview:

KEM is currently delivering engineering and inspection services for a 4-mile section of the historic Holmes County Trail in Holmes County, Ohio. This project encompasses bridge rehabilitation, construction of new retaining walls, installation of culverts, and the application of a new asphalt surface.

Construction Inspection Services:

To ensure adherence to contract plans, specifications, and requirements, KEM conducts daily construction inspections. This includes maintaining detailed logs of project activities and verifying quantities placed. Additionally, KEM performs quality assurance testing to confirm compliance with the established specifications.

Administrative and Coordination Efforts:

KEM facilitates progress meetings, evaluates and approves material submittals, processes change orders, and prepares pay estimates for the Park District’s review and approval.

KEM in the News

Roadwork ahead: Last KEM update as Mansfield’s streetscape project kicks off

Roadwork Ahead: Last KEM Update as Mansfield’s Streetscape Project Kicks Off (richlandsource.com) (opens in a new tab)

The rumble of construction equipment and sight of orange barrels along Mansfield’s Main Street signals the beginning of the long-awaited downtown streetscape project.

As of Feb. 24, blueprints have transitioned to reality, which will transform the city’s core into a vibrant, accessible corridor designed for both practicality and community connection.

KEM finished the planning/design phase of the project and Kokosing Construction has been appointed the contractor with American StructurePoint providing construction oversight.

Beginning of construction

The first operations are prep work for water main replacements.

“The reason we’re doing the full water line main replacement is because we don’t want to go in and construct a brand new road and then have water main breaks,” said Brian McCartney, President of KEM. “It’s an old water main and well over its service life, so we’re going to take care of as much of the underground work as we can up front.”

The water main phase will run from February to the end of May, extending from First to Fifth streets. During this time, at least one southbound lane will remain open during daytime hours, with some nighttime intersection closures necessary for connecting to existing water mains.

Roadwork will begin in June, proceeding block by block from north to south through October 2026.

“It’s not just about Main Street, it’s about the Mansfield community and it’s part of a larger plan to increase the economic development and business investment here,” said Brent Rossman, communication specialist with Downtown Mansfield, Inc. “It’s going to raise the whole community.”

Staying informed

Communication remains a priority throughout construction. Rossman is dedicated solely to relaying information around the project.

“I’m serving as a liaison between StructurePoint, Kokosing and interested parties just to make sure we’re minimizing disruption as much as possible,” he said.

Residents can stay informed through multiple channels including a text notification system, social media updates and a monthly newsletter. The text system will have the most detailed information and allows for two-way communication if anyone has questions.

To sign up, text “mainstreet” to (419) 443-6519.

Other information sources include Downtown Mansfield, Inc social media accounts, changeable message signs along the construction route and mainstreetmansfield.com (opens in a new tab) that will feature progress updates and photography documenting the transformation from local photographer and business owner of 3rd Cup Tea, Braxton Daniels.

Supporting and driving downtown

Throughout construction, pedestrian access to downtown businesses will be maintained, although parking and driving routes will vary.

Main Street shops, restaurants, etc., will remain open, so be sure to show your appreciation.

“It’s really important we support the downtown businesses throughout construction,” Mayor Jodie Perry said.

The city continues to encourage drivers to use Mulberry Street southbound and Diamond Street northbound as alternative routes as they have been designed with timed lights to improve traffic flow. Using these roads will save at least two minutes of a commute and also serve as detours when needed.

“We understand construction is going to cause things to be a little different and maybe change commuting patterns, but we ask people for their patience during this time,” Perry said.

The RAISE program

The streetscape project represents one of the largest federal funding initiatives in Mansfield in recent years.

“This is a very good use of the RAISE program,” said Rob Chappelle, Project Engineer at American StructurePoint. “Just the impact it’s going to have by taking a one-way street and changing it into a two-way street and the access for the businesses along there, is huge.”

As KEM completes their phase of the project, their updates have come to a close. Read the earlier articles in the series (opens in a new tab). To learn more about K.E. McCartney and Associates, visit their website.

“This has been one of the most rewarding projects the KEM Team has worked on,” Brian McCartney said. “Being involved from the vision provided through the Mansfield Rising Plan in 2019, to collaborating with the City on the RAISE grant in 2022, to now seeing the design come to life and witnessing its construction in our own backyard in 2025, I can’t think of a better example of what can be accomplished as a community when its leadership has a clear vision and we work together to achieve that vision’s goals. This project stands as a testament to KEM’s mission to make the communities we work with safer, and one we can be proud of for generations to come.”

Richland County Roundabout Has Reduced Crashes & Injuries

Featured in Ohio Department of Transportation Newsletter Bulletin

Richland County Roundabout Has Reduced Crashes & Injuries (Ohio Department of Transportation) (opens in a new tab)

RICHLAND COUNTY — When a 2018 Richland County Planning Commission study identified the intersection of E. Cook Road/S. Illinois Avenue and Mansfield-Lucas Road in Madison Township as the sixth worst in the county overall, and the worst among those under the county’s jurisdiction, the Richland County Engineer’s Office (opens in a new tab) sought ways to secure funding and improve safety.

Data showed that from 2015-2018, the two-way stop-controlled intersection saw 21 total crashes – an average of five per year – and 15 of those resulted in injury.

The Richland County Engineer applied and was awarded safety funding through the Ohio Department of Transportation’s Highway Safety Improvement Program (opens in a new tab) (HSIP). The purpose of this program is to reduce traffic deaths and serious injuries on all public roads. Funding is available for projects in all stages of development and typically requires a minimum of 10% local match. ODOT safety funds contributed $1.2 million of the total $1.3 million construction contract cost.

With all funding in place, the county was able to move forward with the construction of a single lane roundabout at the intersection of E. Cook Road/S. Illinois Avenue and Mansfield-Lucas Road in 2022.

“The ability for the County to utilize the LPA (Local Public Agencies) process, and Safety Funds administered by ODOT, made the improvement to this dangerous intersection a reality in a timely manner,” said Adam M. Gove, P.E., P.S., Richland County Engineer. “Without this program, the County would have had to delay this project until other funding could be obtained.”

The roundabout was opened in August 2022 and in the two years since its opening, crashes have decreased by 40% with an average of 3 per year and there have been zero injury crashes.

“While only the second roundabout in Richland County, the simple design of a single lane roundabout has proven effective in reducing crashes and injuries, while maintaining the efficiency of this busy intersection,” said Gove.

Employee Spotlight

Tim Weber

Tim WeberWe are delighted to shine the spotlight on Tim Weber, a dedicated Transportation Engineer at our Mansfield headquarters. Tim specializes in designing roadway and bridge projects, and he has been an invaluable member of the KEM team since Spring 2020. Reflecting on his journey, Tim shared that joining KEM has had a tremendous impact on his professional life. In 2021, he achieved a significant milestone by obtaining his PE license, and he has continued to grow as an engineer ever since.

When asked about his motivation, Tim emphasized the importance of working on projects that positively impact our communities. He finds it incredibly rewarding to see the tangible results of his efforts, stating, “It is exciting to drive past projects every day that I helped work on and to know that they are making a positive impact on people’s lives.”

One of Tim’s favorite projects to date is the B&O Connector Trail to Trimble Road in Mansfield, which is set to be constructed later this year. “We designed this trail through what is now nothing but an open field and woods. Instead of replacing existing facilities, it was cool to see a project created from a blank slate. I’m excited to see this project completed and to ride the new trail,” he explained.

Tim describes KEM as “a family-oriented business that cares about the communities we live in and wants to help make them safer. We have a lot of fun working together and creating quality projects for our clients.” He particularly appreciates the camaraderie among his colleagues, noting, “The owners and coworkers are amazing, and they are what makes it fun going to work every day.”

Outside of his professional role, many might be surprised to learn that Tim is also the gym owner of Anvil Athletic Club in Lexington. Tim’s enthusiasm and dedication make him a joy to work with, and we are thrilled to have him as part of the KEM family!

New Employees

Ryan Kilgore

Ryan KilgoreWe are excited to welcome Ryan Kilgore to our team at KEM as our newest surveyor. Ryan brings an impressive 29 years of field experience, specializing in topographic surveys, construction staking, and boundary surveys. His expertise in precise measurements, data analysis, and the use of advanced surveying technologies will be invaluable to our projects. Ryan’s dedication to accuracy, compliance, and collaboration aligns perfectly with our commitment to delivering exceptional results. Please join us in giving a warm welcome to Ryan as he begins his journey with us!

Intern Remarks

Logan Longworth

Logan LongworthThis past winter we had the pleasure of hosting Logan Longworth for an internship in Water and Wastewater.

Over the last few weeks, I had the opportunity of interning with K.E. McCartney & Associates (opens in a new tab). This has been a great learning experience, as I got to see and work on some of their many projects. A special thanks to Philip Lewis, P.E. (opens in a new tab) and Matthew Witter (opens in a new tab) for all their help along the way.

After the three weeks I was there, I am happy to announce that I will be joining the team full time as a Project Engineer for the Water and Wastewater Department following my graduation from OSU in May!

Fun Engineering Words

Engineering Jargon Defined

This quarter we are highlighting some humorous definitions for words associated with engineering.

  • Decommission – throw it out
  • Non-trivial – it’s complicated
  • Zero-point energy field harmonic fluctuation – I don’t know
  • Phase-space incompatibility – I don’t know what is wrong
  • Thermal excursion – things got too hot
  • Rapidly depreciating asset – something is getting old
  • Defeating inverse electron entanglement – we are out of power
  • Asymmetric torque distribution – spinning out of control
  • Induced catastrophe – oops!
  • Strategically unbalanced – this design isn’t going to work
  • Pebkac – problem exists between keyboard and chair

Cooking with KEM

Jackie’s Famous Chocolate Chip Cookies

Enjoy some of KEM employees’ favorite recipes; these cookies have magic powers – bring these to a function and you’re guaranteed to be a fan favorite!

Chocolate chip cookies

  • 2 cups all-purpose flour
  • 1 tsp baking soda
  • 1 tsp salt
  • 1 cup (2 sticks) butter, softened
  • 1 cup brown sugar
  • 1 large box instant vanilla pudding
  • 1 tsp vanilla extract
  • 2 large eggs
  • 2 cups semi-sweet chocolate chips

Preheat oven to 350.

Combine flour, baking soda, and salt in small bowl. Beat butter, sugar and vanilla until creamy. Add vanilla pudding mix and eggs. Mix until all combined. Gradually beat in flour mixture. Drop by tablespoons onto ungreased cookie sheet. Bake for 9-11 minutes, or until golden brown. Remove to wire racks to cool.

Pro-tip! This dough will be very stiff. I use a medium ice-cream scoop to make mine.

KEM Is Hiring

Electrical Design Engineer

KEM is seeking an Electrical Design Engineer to work, preferably, out of our Lorain office (working out of our Mansfield office is a possibility). The Electrical Design Engineer will manage electrical design projects and also be a team member on larger design projects.

See current openings

Get the Newsletter

New issues each season: project spotlights, people news and a message from our president.

Get the Newsletter

A new issue each season, by email: project spotlights, people news and a message from our president.

Required