More in Stormwater
- NPDES MS4 Compliance
- Stormwater Field Services
- Stormwater Utilities
- System Design & Green Infrastructure
Featured Projects
Gerber Stream and Wetland Restoration
KEM, in collaboration with Davey Resource Group, has been contracted to design and oversee construction administration for the Gerber Stream and Wetland Restoration Project, located in Eaton Township along State Route 83.
Kingwood Center Gardens
KEM provided civil engineering services as part of the master planning for Kingwood Center Gardens, focusing on enhancing the visitor experience.
Foster Ditch Restoration
This project involved the restoration of 1.6 miles of ditch through the reestablishment of the cross-section and flowline grade, as well as the removal of fallen trees, debris, and structural obstructions.
Mansfield Stormwater Master Planning
KEM was contracted by the City of Mansfield to provide stormwater master planning for two flood-prone areas within the city.
Kelner Ditch Restoration, LaGrange
This project involved the restoration of 5.2 miles of ditch through the removal of fallen trees, debris, structural obstructions, and accumulated sediment.
Ravine’s Edge Stormwater Retrofit, LaGrange
This project focused on the enhancement of an existing stormwater management facility to incorporate water quality features in compliance with the Ohio EPA’s Small MS4 General Permit No. OHQ000004.



