For Villages, Cities and Counties

Municipal Engineering

For many villages and smaller cities, a full-time staff engineer isn’t affordable or justified by the workload. We serve as your city or village engineer instead, and from the first plan to the final inspection we help you plan improvements, pay for them, design them, bid them and oversee their construction.

Municipal Engineering

What we do

  • Technical advice for council, administration and staff
  • Plan review for public and private development
  • Planning and zoning review
  • Regulatory compliance
  • Master planning
  • Plan development
  • Construction inspection
  • Funding assistance

Planning ahead

We help you plan improvements far enough ahead that funding can be lined up before construction. Planning early also shows residents the cost and effect of an improvement while there is still time to decide whether a project no outside agency requires is worth doing.

On your schedule

Part time, on call, once a month or another arrangement: we set the schedule around your community’s needs. Our aim is the same as yours: a community that is a good place to live and raise a family.

From Planning to Ribbon Cutting

  1. Plan

    Plan review, zoning review and master plans, far enough ahead that funding can be lined up before construction.

    What We Do 
  2. Fund

    We match your project to OPWC, Ohio EPA, OWDA, USDA Rural Development, CDBG and ODOT programs and prepare the applications.

    Funding Assistance 
  3. Design

    Streets and bridges, water and sewer, stormwater and sites, with plans contractors can bid with confidence.

    Our Services 
  4. Bid

    We run the bid for you: plans and addenda online, plan holders, questions and answers, and the results.

    Bid Opportunities 
  5. Build

    Construction administration and inspection, with a KEM inspector on site.

    Construction Administration 

Communities We Work With

7190 Lake Erie Cleveland Bellville Bellville Centerburg Centerburg Fredericktown Fredericktown Galena Galena Lexington Lexington Lucas Lucas Marengo Marengo Sheffield Village Sheffield Village Ontario Ontario Shelby Shelby

Cities

Counties and districts

Select a name to see our projects there.

Programs That Keep Running

NPDES MS4 Compliance

Development and management of your Stormwater Management Program, plus the field work to meet the six minimum control measures.

Learn More 

Stormwater Utilities

With Environmental Rate Consultants (ERC), we help communities set up legally defensible stormwater utilities to fund their programs.

Learn More 

Utility Mapping

Field collection of storm, sanitary and water features with sub-centimeter GPS, built into a GIS database your staff can maintain.

Learn More 

Flow Monitoring, Smoke Testing & CCTV

CCTV inspection, flow monitoring and smoke testing that find capacity limits and sources of inflow and infiltration.

Learn More 

Related Projects

Work for the City of Ontario and the Village of Galena, communities we have served as city and village engineer.

All Municipal Engineering Projects 

Funding Questions

For most communities, the hardest part of an infrastructure project is paying for it.

Funding Assistance
When are funding applications due?

It depends on the program. OPWC applications are normally due in early fall, depending on the district, with money available July 1 of the following year. Ohio EPA takes water pollution control nominations in August or September and drinking water nominations in March. USDA Rural Development and the State Infrastructure Bank take applications any time.

How much of a project can a grant cover?

Anywhere from a quarter to all of it. Safe Routes to School can pay up to 100%, ODOT’s Safety Program up to 90%, and the Small Cities and Municipal Bridge programs up to 80%, with a 20% local match. OPWC provides up to $500,000 as a grant, a 0% loan, or both.

Can one project use more than one source?

Yes. We coordinate several funding sources on one project when that’s what it takes. For the Village of Butler’s regional wastewater plant, that meant more than $5 million in grants.

What if grants don’t cover it all?

There are local options: special assessments, tax increment financing, joint economic development districts, impact fees and stormwater utilities.

In Our Clients’ Words

All References 
We literally got more money than we asked for on this award.
Bruce SnellVillage Administrator, Fredericktown
Just watching your correspondence with the EPA has given me so much respect for your professionalism and your efforts.
Bob VinsackMayor, Village of Hayesville
We did not have a single question from the bidders.
Robert Bianchi, PECity Engineer, Mansfield

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053