Project Details
- Client
- City of Mansfield
- Location
- Mansfield
- Year
- Ongoing
The first study focused on the Glendale Boulevard watershed, where persistent flooding prompted action. Information gathered from residents was compiled into a detailed report, and survey field crews collected site data to inform the analysis. Using survey results, existing construction plans, and GIS data provided by the city, KEM developed a hydraulic model to assess the system. Multiple improvement alternatives were created and evaluated within the model. KEM presented the city with recommended phased projects and their respective cost estimates.
The second study targeted the Barnard Avenue watershed, also known for flooding issues. Information from residents, combined with research data, informed the study. A hydraulic model of the existing storm system was built using gathered field data and survey results. The study included preliminary plans and cost estimates for four potential solutions, allowing KEM to recommend the most effective option to the City.
Additionally, KEM was engaged by the City of Mansfield to perform investigational CCTV services for their storm sewer system over a three-year period on an as-needed basis. Problematic areas identified by the City were televised to locate defects or issues. Using GPS, this information was incorporated into GIS maps of the affected areas. The deliverables to the city included GIS maps, electronic files, CCTV video, and recommendations to address the identified problems.