Project Details
- Client
- City of Mansfield
- Location
- Mansfield
- Year
- 2021
This neighborhood had experienced frequent residential flooding due to the poor condition of a 100-year-old storm sewer system, which suffered from significant deterioration and debris buildup, impairing its functionality.
The solution involved installing a larger parallel storm sewer system along Maple Street to alleviate the flooding. Additional storm sewers were installed along Bennett Street and Westwood Avenue, connecting to the new parallel trunk line on Maple Street. KEM provided survey and design services for the project and assisted with the bidding process.
The final design included 1,300 feet of new storm sewer ranging from 8-inch to 36-inch diameter pipes, along with 21 new storm structures, rerouting of the existing storm sewer, and replacement of other utility crossings. Roadway improvements as part of the project included 131 square yards of reinforced concrete driveway pavement, 438 feet of curb, and 1,640 square feet of sidewalk, all featuring ADA-compliant curb ramps.


