Project Details
- Client
- City of Mansfield
- Location
- Mansfield
The existing system, located at the neighborhood's low point, had Taylor Road as its only outlet, which would have required the purchase and demolition of multiple homes to improve drainage. Taylor Road is approximately 20 feet higher in elevation than the existing catch basins.
To address the flooding, a proposed solution involved adding a second storm sewer along Manchester Road, Taylor Road, Barnard Avenue, and Coleman Road to alleviate the burden on the existing system. The new system was designed to intercept most of the flow before reaching the old infrastructure, redirecting it through new conduit, installed up to 24 feet deep, along Taylor Road. The existing system was retained with a restrictor added to the upstream end to limit incoming flow. Additionally, pipe sizes at the downstream end were increased to accommodate higher flows and prevent surcharging.
KEM provided comprehensive services for the project, including survey, design, construction inspection, and administration. The final design incorporated 3,122 feet of storm sewer (up to 48 inches in diameter), 42 new structures, 204 feet of waterline relocation, and associated drive and roadway repairs.



