Foster Ditch Restoration

This project involved the restoration of 1.6 miles of ditch through the reestablishment of the cross-section and flowline grade, as well as the removal of fallen trees, debris, and structural obstructions. To ensure ongoing maintenance, a permanent easement was established along the ditches.

Foster Ditch Restoration

Project Details

Client
Lorain County Stormwater Management District
Location
LaGrange
Year
Ongoing
Status
Completed

KEM provided comprehensive services, including funding procurement, surveying, design, easement acquisition, bidding coordination, and construction administration. Design services encompassed profile grading, cross-sectional grading, and maintenance access drive grading.

Additionally, KEM played a key role in the ditch petition process, facilitating critical steps such as ditch inspection, viewing presentations, preliminary and final reporting, and hearing presentations.

This project was funded through H2Ohio, a collaborative initiative led by the Ohio Department of Agriculture, Ohio Department of Natural Resources, Ohio EPA, and the Ohio Lake Erie Commission. As part of this effort, two conservation ditch sections were created. These sections were designed as self-forming ditches, featuring an overwide ditch bottom that allows the low-flow channel to develop a natural sinuous flow pattern.

Project Photos

March 2025 10 photos
  • Foster Ditch Restoration, March 2025, photo 1 of 10
  • Foster Ditch Restoration, March 2025, photo 2 of 10
  • Foster Ditch Restoration, March 2025, photo 3 of 10
  • Foster Ditch Restoration, March 2025, photo 4 of 10
  • Foster Ditch Restoration, March 2025, photo 5 of 10
  • Foster Ditch Restoration, March 2025, photo 6 of 10
  • Foster Ditch Restoration, March 2025, photo 7 of 10
  • Foster Ditch Restoration, March 2025, photo 8 of 10
  • Foster Ditch Restoration, March 2025, photo 9 of 10
  • Foster Ditch Restoration, March 2025, photo 10 of 10
December 2024 9 photos
  • Foster Ditch Restoration, December 2024, photo 1 of 9
  • Foster Ditch Restoration, December 2024, photo 2 of 9
  • Foster Ditch Restoration, December 2024, photo 3 of 9
  • Foster Ditch Restoration, December 2024, photo 4 of 9
  • Foster Ditch Restoration, December 2024, photo 5 of 9
  • Foster Ditch Restoration, December 2024, photo 6 of 9
  • Foster Ditch Restoration, December 2024, photo 7 of 9
  • Foster Ditch Restoration, December 2024, photo 8 of 9
  • Foster Ditch Restoration, December 2024, photo 9 of 9

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053