Aerial 3D LiDAR Scanning

KEM recently added aerial 3D LiDAR scanning to our list of surveying services. By purchasing the DJI Matrice 350 RTK, we can provide highly accurate models of existing site conditions with a level of efficiency and quality that was not possible through traditional surveying methods. Gathering topo data for a large site by traditional surveying methods is not only less efficient, but also lacks any visual references to get a perspective of the terrain and landscape. Through the utilization of aerial LiDAR, we are able to spend a fraction of the time on site and, ultimately, provide a higher-quality end product to the client. Traditional surveying methods are still being utilized to set project control and gather data on underground utilities. Said data, collected through traditional methods, can then be used as a QA/QC check to verify coordinates and elevations within the LiDAR point cloud, ensuring that the end product is as accurate as possible.

The use of Aerial LiDAR technology allows KEM to take on more projects and reduces many of the unknowns that can cause issues during the design process. This is another example of KEM’s commitment to stay on the cutting edge of technological advancements so we can provide the best services possible to our clients.

Project Spotlight

Bellville Sidewalks Project

KEM designed 1,500 feet of new sidewalk along the east side of SR 13 (S. Main St.) to connect Betty Drive to the existing sidewalk near Bellville Court Apartments on the south side of Bellville. The project also includes the installation of new driveway approaches, signing, markings, retaining wall, curb, curb ramps and drainage. This is a major safety improvement for Bellville residents. Currently, there is no connection for pedestrian travel along a very busy SR 13 from the existing Hamilton Hills and Urban Meadows subdivisions on the south side of the Village. The project is under construction with completion scheduled by the start of the Bellville World’s Fair in mid-September.

KEM in the News

Mansfield City Council OKs final parts of $17 million improvement project

Main Street Transformation: Mansfield City Council OKs Final Parts of $17 Million Improvement Project (richlandsource.com) (opens in a new tab)

The Mansfield arch over Main Street

A Main Street road to improvement that began six years ago in Austin, Texas, cleared its last legislative hurdle at Mansfield City Council on Tuesday night.

The conception of a $17 million Main Street Corridor Improvement Plan began in 2018 during the annual South by Southwest conference, attended by a group of 15 local residents as part of the initial Mansfield Rising project.

The basic tenets of Mansfield Rising, a downtown reinvestment plan, was to dramatically improve the downtown’s attractiveness and abilities in terms of business, gathering and living.

The Main Street Corridor Improvement Plan was seen as a key element in that effort, according to officials, who worked with K.E. McCartney & Associates to write an application for the federal Rebuilding American Infrastructure with Sustainability and Equity competitive grant program.

That effort led to an announcement in 2022 that the city would receive a $7.3 million federal RAISE grant for the project, which local lawmakers officially accepted Tuesday night, along with other final funding sources.

City engineer Bob Bianchi told council the project now has 14 funding sources, including federal, state and local dollars. About 80 percent of the funds needed for the project are not local tax dollars.

Council on Tuesday officially authorized the city to seek bids for the project, scheduled to begin in February and be complete by October 2026. The work will be done in stages to lessen the impact along the entire corridor from First Street to Sixth Street.

“It’s been a long process and we’re there and we believe we’ve got all the funds necessary to do the project,” Bianchi said.

Actual construction costs are estimated at $15.6 million with another $1.4 million for construction inspection, he said.

“I anticipate having a (contract) awarded in early January, maybe even in December. We’ll then know the contractor and we’ll start setting up for preconstruction meetings and construction will start. Our goal is February 2025,” he said.

The project includes a complete upgrade from Main Street from First to Sixth streets and Park Avenue from Main to Diamond streets.

The project involves replacing water mains, storm sewers, streetscape amenities, streetscape furnishings, decorative hardscape, sidewalks, curb ramps, signals, landscaping and lighting, Bianchi said.

The north and south plazas will be fully renovated, including fountain reconstruction.

He said new installations, such as mid-block pedestrian crossings, seating and decorative walls/fencing, brick crosswalks, brick hardscape, traffic control devices, irrigation, fiber, wayfinding signage and two decorative arches are included in the project.

Bianchi said road resurfacing and pavement striping will be done as Main Street is converted to two-way traffic.

KEM Project Recognized by Greater Ohio Policy Center

The Mission of the Greater Ohio Policy Center is to champion revitalization & sustainable growth in Ohio.

GOPC Active Transportation Update (mailchi.mp) (opens in a new tab)

Rendering of the redeveloped Main Street in downtown MansfieldGreater Ohio Policy Center (GOPC) is excited to share with you our newly published guide How to Build Safe, Vibrant Streets in Ohio: A Guide for Non-Engineers. The guide provides tips for implementing active transportation projects, sources of funding for projects communities in Ohio can access, and technical assistance that can help plan and fund projects at the state and federal level.

At the heart of the guide are six case studies that feature active transportation projects in communities throughout Ohio. The projects, which range from modest in scale to complete overhauls of a district streetscape, show how cities in Ohio are working collaboratively to address local needs.

The six communities profiled are:

Xenia Protected Bike Lane

In Xenia, the city implemented a series of safety improvements in downtown, including a protected bike lane, that connects Xenia’s downtown to a larger regional trail network. At a cost of $1.5 million, the city was able to add one protected bike lane, expand a key median, and undertake other intersection improvements.

Columbus Summit Street Cycle Track

Columbus leaders took the opportunity created by a routine resurfacing project to completely redesign a major urban corridor. Summit Street now has Ohio’s first cycle-track bike lanes. At a cost of $7 million, the project included the construction of one protected cycle-track and associated infrastructure, and one unprotected bike lane on a parallel street.

Mansfield Downtown Redevelopment

A multi-year economic development campaign led community members and city leaders in Mansfield to embark on an effort to make the Main Street corridor more welcoming and pedestrian friendly. Layering federal, state, local, private, and public funds, the $27.1 million project will include streetscaping, street conversions (one-way to two-way traffic) and a downtown park restoration.

Youngstown Downtown Redesign

Youngstown is completing a major infrastructure overhaul in the core of the city’s downtown, including narrowing streets and widening sidewalks to better connect downtown’s people and assets. With a $12 million budget, the project incorporates complete street elements on five downtown streets, as well as a new autonomous shuttle.

Bexley Bike/Ped Investment

Over the past twenty years, the inner-ring suburb of Bexley has invested significantly in cycling and pedestrian infrastructure improvements to make the city safer for all road users of all types of modes. To date, the city has invested over $12 million on streetscape improvements and bike paths.

Lorain Collaborative Impact Model

Lorain has implemented an Active Transportation plan through the collaboration of agencies and nonprofits coming together to propel a shared vision for health and safety. Investing $4 million to date, the projects include a bike share program, 1 bike lane, sidewalk and intersection improvements, and a shuttle service.

The Active Transportation guide How to Build Safe, Vibrant Streets in Ohio: A Guide for Non-Engineers (opens in a new tab), shows that communities around Ohio are making changes to street designs to improve their communities for pedestrians, cyclists, people in wheelchairs or strollers. The projects are being implemented for the benefit of individual residents, but there are clear economic benefits to the communities as well. These projects are creating vibrant downtowns, neighborhood districts, and community gathering spaces.

Employee Spotlight

David Gooch

David GoochThis summer quarter employee spotlight goes out to David Gooch! David is a Senior Project Engineer at KEM, meaning his days are spent both in the office and on the jobsite. From preconstruction plan evaluation to project finalization, he strives to ensure that work is performed safely and the contractor adheres to plan specifications, budgets, and completion schedules.

David began working at KEM as an engineering intern in 2013, becoming a professional engineer in 2018. When asked how working here has impacted his life, David said, “KEM continues to provide an opportunity for me to grow as an engineer and tackle a wide range of construction projects.”

David has been a lover of construction since childhood, making it easy to be motivated for work every day. He stated, “I’ve always liked to take things apart, figure how to fix or repurpose them, and put them back together. Today, I get to do that on a much larger scale!”

The new bridge construction over Norfolk Southern railroad on Highbridge Rd in Vermilion, Ohio has been one of David’s favorite projects to work on. He said, “the project included many other components besides the structure, and the contractor was a pleasure to work with.”

David said that his favorite thing about work is the people, collaborating with them to find solutions, and the nature of the work that KEM performs.

You may not know that David has an impressive and growing collection of over 45 houseplants, the oldest being almost 24 years old.

We appreciate everything David does; he is an important part of our team, and we are lucky to have him.

New Employees

Monica Hecht

Monica HechtKEM is pleased to welcome Monica Hecht to our team as Administrative Assistant. Monica brings over 30 years of experience in the accounting field, working in both the manufacturing and healthcare industries. Outside of work she enjoys hiking and crocheting. She kindly uses her crocheting skills to make blankets for Project Linus and hats and scarves for homeless outreach programs. Monica is a great addition to the KEM team, and we are excited to have her!

Mary Troupe

Mary Troupe

Mary Troupe has recently joined the KEM team full time as an Engineering Technician, after interning with us the past two years. Mary graduated from Ohio Northern University with a Bachelor of Science in Civil Engineering. She is excited to develop a comprehensive understanding of transportation structural engineering. Mary is passionate about the outdoors, performing arts, and being a lifelong learner. She and her husband, Garrett, are always looking for the next outdoor adventure. Their past adventures include paddle boarding in the Atlantic Ocean, whitewater rafting in the Smokey Mountains, and most recently cliff jumping in Mexico. Mary loves the performing arts – she plays two instruments, flute and piano, and minored in dance while at ONU. She aims to read 60 books a year and has already read 30 books this year! Mary brings great energy and drive to the KEM team, and we are glad to have her on full time!

Fun Engineering Words

Jargon – Defined

This quarter we are highlighting some humorous definitions for words our associates on the electrical engineering side use:

  • Kinetic disassembly – it blew up
  • Spontaneous kinetic disassembly – it blew up when it wasn’t supposed to
  • Kinetic relocation – it got flung way the hell over there
  • Thermal shock – it burned
  • Thermally reconfigured – it melted
  • Organic grounding – someone got electrocuted

Cooking with KEM

Brandon’s Hickory Nut Pie

Enjoy some of KEM employees’ favorite recipes starting with this decadent hickory nut pie!

  • 1 unbaked pie crust (your preference)
  • 2 ½ cups shelled hickory nuts
  • 3 large eggs
  • 1 cup dark/light corn syrup
  • ½ cup packed brown sugar
  • 1 ½ tsp pure vanilla extract
  • ¼ c unsalted butter
  • ½ tsp salt
  • ½ tsp ground cinnamon (optional)
  1. Preheat oven to 350 degrees.
  2. Roughly chop the hickory nuts and spread evenly inside pie crust. Whisk the eggs, corn syrup, brown sugar, vanilla, melted butter, salt and cinnamon together until combined. Pour over hickory nuts.
  3. Bake the pie for 50-55 minutes or until top is lightly browned. You may tent a piece of foil over the whole pie if it is browning too quickly. Remove finished pie and let cool completely.
  4. Slice and serve warm or at room temperature.
  5. Cover and store leftovers at room temp for 1-2 days or in the fridge for 4-5 days. Enjoy!

Intern Remarks

Bennett Lawrence on a bridge replacement siteBennett Lawrence, a Civil Engineering student from the University of Dayton, joined us this summer as a seasonal project inspector.

This summer I had the incredible opportunity to intern for K.E. McCartney & Assoc, Inc (opens in a new tab) as a Seasonal Project Inspector.

I was primarily at a bridge replacement project in Mansfield, Ohio where I was responsible for ensuring that the project was being constructed as expected. Additionally, I surveyed a few locations across Mansfield for completed projects as well as in preparation for upcoming projects.

Throughout my internship, I continuously communicated with my team members and those on the job site. Maintaining effective communication between all parties involved was imperative to ensure the success of the project. While on the job site, I developed an understanding for basic construction techniques and principles. From performing a hydro excavation to observing construction workers demonstrate several operations, I learned more and more about construction each day.

My key takeaway from this internship is the importance of fully understanding the project plans and goals. I want to thank Brian McCartney, Cody Gerhardt, and Jason Burgholder, P.E. for such an enriching experience. I can’t wait to apply the knowledge I have gained from this internship toward my education.

Get the Newsletter

New issues each season: project spotlights, people news and a message from our president.

Get the Newsletter

A new issue each season, by email: project spotlights, people news and a message from our president.

Required