Project Details
- Client
- Richland County Development Group
- Location
- Mansfield
- Year
- 2020
- Status
- Completed
- Photos
- 9 photos ↓
The schematic plans prepared by KEM were instrumental in promoting the site to prospective businesses, showcasing Richland County as an ideal location for industrial investments. Alternative layouts were provided to highlight the extensive possibilities the land offered for industrial use.
As part of the project, KEM conducted Master Plan stormwater management calculations and design for the industrial park. A key feature of this effort was the design of the regional detention basin, referred to as the Stormwater Management Facility project, which was engineered to accommodate a fully developed industrial park. Construction plans were developed for the facility, including a Stormwater Pollution Prevention Plan (SWP3).
KEM further supported the project by assisting the city with permitting and overseeing construction administration. Regular plan revisions and on-site inspections were conducted throughout the project’s duration to ensure successful implementation.