Boone Road Sewer & Pump Station

KEM was hired by the Lorain County Sanitary Engineering department to examine the options for extending sanitary sewer service along Snell Road and Boone Road, located in Columbia Township, to serve multiple planned and future developments within the township.

Boone Road Sewer & Pump Station

Project Details

Client
Lorain County
Year
2021

It was ultimately determined to construct a new pump station near the intersection of Snell and Boone Road and pump the flows to the existing Marks Road trunk sewer. The project included the installation of 3,800 linear feet of 27″ diameter sanitary trunk sewer; a pump station rated at 2,000 gpm to handle all flows projected over the next 20 years, with the ability to be upsized if growth extends beyond that; and over 5,000 linear feet of 12-inch force main.

Before settling on the pump station, KEM compared two options: extending a gravity sewer to the existing lift station on Redfern Road, or building a new lift station to pump flows to the existing gravity trunk sewer on Marks Road.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053