Project Details
- Client
- Lorain County
- Location
- Columbia Township, Lorain County
- Year
- 2021
It was ultimately determined to construct a new pump station near the intersection of Snell and Boone Road and pump the flows to the existing Marks Road trunk sewer. The project included the installation of 3,800 linear feet of 27″ diameter sanitary trunk sewer; a pump station rated at 2,000 gpm to handle all flows projected over the next 20 years, with the ability to be upsized if growth extends beyond that; and over 5,000 linear feet of 12-inch force main.
Before settling on the pump station, KEM compared two options: extending a gravity sewer to the existing lift station on Redfern Road, or building a new lift station to pump flows to the existing gravity trunk sewer on Marks Road.




