Galena Brick Trail, Phase 3

KEM provided grant writing, engineering design, field survey, construction documents, utility coordination, drainage design, right of way easements, and construction inspection and administration services for the 0.67-mile extension of the multi-use trail in the Village of Galena.

Galena Brick Trail, Phase 3

Project Details

Client
Village of Galena
Location
Galena
Year
2019
Status
Completed

The project extended the trail on an abandoned railroad making the final connection between Phase 1 and Phase 2 and the Sandel Legacy Trail heading north to Sunbury. The project included construction of a ten-foot-wide asphalt trail along with several bump outs for benches and a 320-foot connector trail to the Zoar Street development. The Clean Ohio Trails Fund was utilized to make this project a reality.

Project Photos

November 2019 10 photos
  • Galena Brick Trail, Phase 3, November 2019, photo 1 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 2 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 3 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 4 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 5 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 6 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 7 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 8 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 9 of 10
  • Galena Brick Trail, Phase 3, November 2019, photo 10 of 10

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053