Project Details
- Client
- Environmental Design Group
KEM installed a total of 10 flow meters within the sanitary systems, with pipe diameters up to 21 inches, over a monitoring period of three months.
KEM served as a subconsultant to EDG, conducting flow monitoring services for Cuyahoga County. The project aimed to identify potential inflow and infiltration issues in Olmsted Township, focusing on the Greenbrooke and Lakeside-Pinewood pump station areas.
KEM installed a total of 10 flow meters within the sanitary systems, with pipe diameters up to 21 inches, over a monitoring period of three months.
KEM was engaged as a subconsultant to EDG for the City of Aurora’s Inflow and Infiltration (I&I) Study, providing flow monitoring services over a two-year period.
KEM is a member of the Project Team for the Chagrin and Lake Erie Tributaries (CHALET) Stormwater Master Plan.
KEM collaborated as part of the project team conducting a local sanitary system evaluation study for the Northeast Ohio Regional Sewer District within the service area of the Cuyahoga Valley Interceptor sewer.