Project Details
- Client
- Lorain County Sanitary Engineer
- Location
- LaGrange
- Year
- 2019
KEM evaluated all the existing processes of the treatment plant and formulated alternatives to achieve compliance with their NPDES permit. KEM developed capital costs and present worth values for each alternative. Taking cost factors, feasibility, construction, and O&M into account, KEM developed a recommended alternative. This alternative included the design of a lift station and force main to convey the Pheasant Run wastewater to a nearby WWTP. As part of this alternative, the existing Pheasant Run WWTP was converted to equalization for wet weather flows. KEM also provided a Sanitary Sewer Evaluation Survey (SSES) for the existing sanitary collection system. KEM conducted flow monitoring and CCTV of the sanitary system to determine areas in need of rehabilitation to reduce I/I. KEM utilized this information to develop sanitary sewer rehabilitation plans and specifications.