Abbe Road Signal at the Ford Plant, Sheffield

In 2024, KEM was selected by the Village of Sheffield to design a new traffic signal and driveway entrance for the Ford plant on Abbe Road (SR 301), along with the removal of two existing driveways and their associated signals.

Project Details

Client
Village of Sheffield
Location
Sheffield
Year
2025

The new signal design incorporates combination mast arms with integrated roadway lighting, emergency vehicle preemption, stop bar and advance dilemma zone radar detection, a universal power supply, and provisions for future integration into a hardwired closed-loop system. The layout also accommodates a future driveway connection opposite the proposed Ford plant entrance.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053