Project Details
- Client
- Village of Bellville
- Location
- Bellville
- Year
- 2012–2014
The system-wide model revealed that the northeast portion of the Village had very low pressures, in addition to low fire flows throughout the Village, due to a number of small diameter water lines. KEM completed the design, bidding, and construction management of the first of four phases of the improvements, which included the installation of a new 12-inch water main that serves as the new “backbone” of the entire water distribution system.
KEM provided construction administration and inspection services for a water main replacement along State Route 97, School Street, and State Route 13 in the Village of Bellville, Ohio. During construction, water service was maintained for all residents, businesses, and the Bellville Elementary School with minimal disruption. Traffic was maintained at all times on the major arterial roads. Additional coordination was required during the restoration of pavement and the installation of new sidewalks and drive aprons. KEM worked with the contractor and the Village Water Department to coordinate and minimize any shutdowns while side street connections were made. During construction, it was determined that the Village could eliminate an altitude valve, thereby saving significant funds.