Black River Trail, Phase 4E

KEM was selected to provide construction contract administration and inspection services for the development of the Black River Bikeway on behalf of the Lorain County Metro Park District.

Black River Trail, Phase 4E

Project Details

Client
Lorain County Metro Parks
Location
Elyria
Year
2021
Status
Completed

This $1,755,000 LPA Local Let Project involved constructing 0.21 miles of shared-use path and a pedestrian bridge, designed to connect the previously completed trail segments in Cascade Park and Elywood Park.

The pedestrian bridge, a two-span 400-foot prefabricated steel truss superstructure, featured a wood deck spanning the Black River. Its substructure comprised reinforced concrete stub abutments, along with a cap and column pier supported by drilled shafts socketed into bedrock along the river. Additionally, the project included the installation of new signage and restoration activities such as seeding, mulching, and tree planting.

Project Photos

October 2020 5 photos
  • Black River Trail, Phase 4E, October 2020, photo 1 of 5
  • Black River Trail, Phase 4E, October 2020, photo 2 of 5
  • Black River Trail, Phase 4E, October 2020, photo 3 of 5
  • Black River Trail, Phase 4E, October 2020, photo 4 of 5
  • Black River Trail, Phase 4E, October 2020, photo 5 of 5

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053