Canal Park Path, Dover

KEM was selected to provide construction contract administration and inspection services for the Canal Park Path project in the City of Dover.

Project Details

Client
City of Dover
Location
Dover
Year
2022

This ODOT District 11 LPA local-let project involved constructing a 1.1-mile, 10-foot-wide multi-use trail along the Tuscarawas River, between South Tuscarawas Avenue and East Avenue. The trail was built with a 5-inch 304 limestone aggregate base on a prepared subgrade, topped with a 1-inch surface of limestone screenings. The project also included the installation of 36 new decorative light poles and luminaires, as well as the construction of several bioretention cells on both sides of the trail and drainage upgrades.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053