B&O Connector Trail, Mansfield

KEM designed the Trimble Road trail extension for the City of Mansfield. This project connects the Trimble Trail to the B&O Trail via a scenic route that meanders through the Western Reserve Conservancy and a wooded area owned by Ohio Health.

B&O Connector Trail, Mansfield

Project Details

Client
City of Mansfield
Location
Mansfield
Year
2025
Status
Completed

The new trail spans 6,000 feet on a new alignment with a 140-foot change in vertical elevation, beginning at the Trimble Road tunnel and ending at the B&O Trail near the intersection of Marion and Home Roads.

The project includes an 11-foot-wide concrete path and a 300-foot boardwalk, guiding pedestrians through scenic wetlands and woods. Additionally, the project encompasses the installation of culverts, vegetated Best Management Practices (BMPs), trail signage and markings, subgrade stabilization, and various other trail amenities.

Project Photos

April 2026 10 photos
  • B&O Connector Trail, Mansfield, April 2026, photo 1 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 2 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 3 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 4 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 5 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 6 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 7 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 8 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 9 of 10
  • B&O Connector Trail, Mansfield, April 2026, photo 10 of 10
October 2025 8 photos
  • B&O Connector Trail, Mansfield, October 2025, photo 1 of 8
  • B&O Connector Trail, Mansfield, October 2025, photo 2 of 8
  • B&O Connector Trail, Mansfield, October 2025, photo 3 of 8
  • B&O Connector Trail, Mansfield, October 2025, photo 4 of 8
  • B&O Connector Trail, Mansfield, October 2025, photo 5 of 8
  • B&O Connector Trail, Mansfield, October 2025, photo 6 of 8
  • B&O Connector Trail, Mansfield, October 2025, photo 7 of 8
  • B&O Connector Trail, Mansfield, October 2025, photo 8 of 8

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053