Project Details
- Client
- City of Mansfield
- Location
- Mansfield
- Year
- 2024
- Status
- Completed
- Photos
- 43 photos · 1 video ↓
- Services
The project includes the construction of approximately 400 feet of an 11-foot-wide concrete trail and a 96-foot-long precast box tunnel. Additionally, it involves the installation of modular block retaining wall structures, tunnel lighting, security cameras, water main relocation, drainage structures, regrading work, and the replacement of Trimble Road pavement and sidewalks.



