The project covers six intersections between Sycamore Line and Cedar Point Drive. It includes the city’s first roundabout, a modified single-lane roundabout at Cleveland Road and Cedar Point Drive, the main entrance to Cedar Point.
The project includes:
- A modified single-lane roundabout at Cedar Point Drive, with new crosswalks and upgraded intersection lighting
- New turn lanes at Harbor Parkway and Remington Avenue, with new signal poles and mast arms at both intersections
- Removal of the traffic signals at Avondale/McKinley Streets, Cowdery Street and Milan Road, replaced with stop control
- New sidewalk, curb and drainage on the north side of Cleveland Road from Harbor Parkway to East Shoreway Drive, connecting to the Sandusky Bay Pathway
- Transit bus pull-off areas near Harbor Parkway
- Storm sewer, underdrains, a water quality structure and utility relocations at Cedar Point Drive
- Resurfacing of Cleveland Road and Sycamore Line Drive
The construction contract was approved in December 2025. Federal Highway Administration safety funds, administered through the Ohio Department of Transportation, cover $3.32 million of the cost, with the balance from the city’s Capital Projects Fund.
Construction began in February 2026. Cedar Point Drive was closed at Cleveland Road from April 1 while the roundabout was built, and the roundabout opened to traffic in early May 2026, ahead of Cedar Point’s opening day. Work on the rest of the corridor continued through the fall.