Project Details
- Client
- Richland County Engineer
- Location
- Richland County
- Year
- 2025
- Status
- Completed
- Photos
- 57 photos · 2 videos ↓
The project consisted of the demolition of the existing concrete tee beam bridge and replacing it with prestressed I-beams with a concrete deck and approach. The existing bridge was narrower than the drive lanes, which increased the risk of accidents on a county road that has a posted speed limit of 55 MPH. This project was a local let LPA with a DBE goal of 10%. The project called for a 120-day road closure and was ultimately completed ahead of schedule and under budget. KEM was onsite monitoring and documenting the daily activities of the contractor, providing concrete testing services, and prepared pay estimates for the county.