Richland County Road 182 Bridge Replacement

KEM has been appointed to oversee construction contract administration and inspection services for the RIC-CR182-1.76 Bridge Replacement Project. This project entails the demolition of the existing bridge structure and the construction of a new one.

Richland County Road 182 Bridge Replacement

Project Details

Client
Richland County Engineer
Year
2024
Status
Completed

Additionally, it involves the removal and reconstruction of approximately 200 feet of asphalt roadway, along with enhancements to the drainage system within the right-of-way. The new bridge features prestressed non-composite box beams on integral abutments, each supported by six 12-inch pipe pilings.

Project Photos

July 2026 10 photos
  • Richland County Road 182 Bridge Replacement, July 2026, photo 1 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 2 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 3 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 4 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 5 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 6 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 7 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 8 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 9 of 10
  • Richland County Road 182 Bridge Replacement, July 2026, photo 10 of 10

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053