Elyria Township Safe Routes to School, Phase 2

KEM provided design services from 2018 to 2019 for the $225,000 Safe Routes to School project under the ODOT Local Let process. The Lorain County Engineer sponsored this project, which involved the construction of 0.8 miles of new sidewalk in Elyria Township on the south side of Griswold Road.

Elyria Township Safe Routes to School, Phase 2

Project Details

Client
Lorain County
Year
2020

KEM's services included preliminary engineering, field survey, field review, and final design. The project encompassed the addition of a new five-foot-wide sidewalk, drainage modifications, and curb ramps connecting to the Elyria City Schools and Crestwood Elementary School sidewalks. Special care was taken during the design phase to limit impacts on adjacent landscaping features and trees, minimize environmental and right-of-way impacts, and maintain surface drainage in this very flat area. Additionally, the project included the installation of a structure and extension of a culvert pipe at Martin’s Run Ditch to create a pedestrian crossing.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053