Fredericktown Safe Routes to School

KEM has been selected by the Village of Fredericktown to design a sidewalk project that will connect the existing sidewalk from the housing development at Struble and Bollinger to the existing walkway at Carol Drive.

Fredericktown Safe Routes to School

Project Details

Client
Village of Fredericktown
Year
2027 (expected)

This project will involve the construction of approximately 2,500 feet of new sidewalk, including a mid-block crossing of SR 95 (W Sandusky St) at the west end of the project and a crossing at Carol Drive.

The new sidewalk will connect to the existing sidewalk system on Levering Drive, which links to the Fredericktown School Campus. Additionally, the project will encompass driveway reconstruction, minor drainage improvements, signage, and pavement markings.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053