Project Details
- Client
- Village of Fredericktown
- Location
- Fredericktown
- Year
- 2013
KEM provided field survey and prepared construction documents for this 1.5-mile multi-use trail in the Village of Fredericktown. Funding was received through ODOT Enhancement Funds and plan development fell under the LPA Process. This 10′ wide trail provided a connection between two parks on each end of the project.

KEM has been selected by the Village of Fredericktown to design a sidewalk project that will connect the existing sidewalk from the housing development at Struble and Bollinger to the existing walkway at Carol Drive.
KEM has been selected by the City of Shelby to design a roadway reconstruction project for Mickey Road, spanning from SR 61 to SR 309.
KEM has been selected by the Village of Plymouth to design a Safe Routes to School project.