The Village of Fredericktown's sewer system was originally built as a combined sewer for sanitary and stormwater. In an effort to reduce pollution into the North Branch Kokosing River from the overloaded Wastewater Treatment Plant, the Village has been in the process of conducting a master plan to separate the two sewers village-wide. KEM's role in the Combined Sewer Separation Project included Phases 7 & 8. These phases consisted of West Sandusky Street (State Route 95), Taylor Street and West Second Street. The services provided included survey of the surrounding area, design, job bidding, construction administration and on-site inspections. The final design comprised approximately 1,000 feet of separated storm sewer, 12 storm structures, drive and roadway repairs and sanitary sewer repairs. KEM also assisted the Village with acquiring funding for the project which included an OPWC grant.

Fredericktown Sewer Separation

Project Details

Client
Village of Fredericktown
Year
2019
Status
Completed

Project Photos

November 2019 6 photos
  • Fredericktown Sewer Separation, November 2019, photo 1 of 6
  • Fredericktown Sewer Separation, November 2019, photo 2 of 6
  • Fredericktown Sewer Separation, November 2019, photo 3 of 6
  • Fredericktown Sewer Separation, November 2019, photo 4 of 6
  • Fredericktown Sewer Separation, November 2019, photo 5 of 6
  • Fredericktown Sewer Separation, November 2019, photo 6 of 6

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053