Project Details
- Client
- Village of Fredericktown
- Location
- Fredericktown
- Year
- 2019
- Status
- Completed
- Photos
- 6 photos ↓
The Village of Fredericktown's sewer system was originally built as a combined sewer for sanitary and stormwater. In an effort to reduce pollution into the North Branch Kokosing River from the overloaded Wastewater Treatment Plant, the Village has been in the process of conducting a master plan to separate the two sewers village-wide. KEM's role in the Combined Sewer Separation Project included Phases 7 & 8. These phases consisted of West Sandusky Street (State Route 95), Taylor Street and West Second Street. The services provided included survey of the surrounding area, design, job bidding, construction administration and on-site inspections. The final design comprised approximately 1,000 feet of separated storm sewer, 12 storm structures, drive and roadway repairs and sanitary sewer repairs. KEM also assisted the Village with acquiring funding for the project which included an OPWC grant.

Completed 6 photos Latest November 2019
KEM has been selected by the City of Shelby to design a roadway reconstruction project for Mickey Road, spanning from SR 61 to SR 309.
K.E. McCartney & Associates, Inc. (KEM) was engaged by the Village of Marengo to develop improvements to its sanitary system to allow for future expansion and growth.
KEM was contracted by the City of Ontario to develop construction plans for replacing their undersized 8-inch sanitary sewer, which collects flows north of State Route 30 near Lexington-Springmill Road.