Project Details
- Client
- Fredericktown
- Location
- Fredericktown
- Year
- 2024
- Status
- Completed
- Photos
- 19 photos ↓
Enhancements encompassed the installation of new widened sidewalks, curbs, and curb ramps, all designed to be ADA compliant. To accommodate the widened sidewalks, the existing angled on-street parking was reconfigured to parallel parking. Additionally, new decorative lighting was installed, featuring festival outlets attached to the light poles and positioned at the base of each newly planted tree. The project also involved the removal of three existing signals, which were replaced with an all-way stop condition. To further enhance the aesthetics of downtown, new trees, tree grates, brick walk borders, and decorative signage were installed.