Project Details
- Client
- City of Mount Vernon
- Location
- Mount Vernon
- Year
- 2021
- Status
- Completed
- Photos
- 6 photos ↓
The original trail traverses the busy intersection of State Route 13 and Columbus Avenue in the heart of Mount Vernon, where users rely on a traditional push-button pedestrian crosswalk relay to cross safely. While effective, the current system causes significant delays for both pedestrians and vehicular traffic.
To address these challenges, the City of Mount Vernon proposed a modern alternative route that preserves the at-grade crossing while offering trail enthusiasts an uninterrupted experience. This innovative solution involves utilizing a single barrel of the aqueduct bridge spanning the Kokosing River. By filling the low-flow channel and constructing a new 2,300-foot stretch of 10-foot-wide, 6-inch-thick non-reinforced concrete trail, users would be able to pass beneath State Route 13 and enjoy views of the Kokosing River, free from traffic interruptions.
The project incorporates several engineering measures to ensure stability and environmental protection. H-piles driven into bedrock and backfilled with tremie concrete will support precast panels at the east side of the bridge crossing. A revetment ditch was installed on the south side of the Kokosing River to prevent riverbank erosion caused by construction-related runoff. Additionally, two 6-foot diameter dry wells will intercept stormwater from catch basins to minimize the risk of slick or icy surfaces on the new concrete trail.
Programmed as an ODOT District 5 LPA Local Let Project, KEM was selected to provide construction contract administration and inspection services for this innovative undertaking.