Project Details
- Client
- Village of Crestline
- Location
- Crestline
- Year
- 2024
The project aimed to supply water to Leesville while also improving system reliability by creating looping connections with three existing dead-end lines.
The Village of Crestline utilized ARPA funds, provided by the Crawford County Commissioners, to extend water service to Leesville. KEM was engaged to design construction plans for the installation of approximately 12,000 linear feet of 6-inch PVC water main.

The project aimed to supply water to Leesville while also improving system reliability by creating looping connections with three existing dead-end lines.
KEM has been selected by the City of Mansfield to design a comprehensive sidewalk and infrastructure improvement project in downtown Mansfield.
In 2024, the City of Mansfield enacted an income tax to fund the replacement of outdated 4-inch waterlines with new 8-inch lines in areas where fire protection was insufficient.
The County faced recurring water main breaks along Grove Avenue, the lowest point in their service area with the highest water pressures.


