Project Details
- Client
- City of Lorain
- Location
- Lorain
- Year
- 2023
- Status
- Completed
- Photos
- 6 photos ↓
This initiative involved traffic signal enhancements and cabinet modifications along the Broadway corridor, spanning from 39th Street to Elyria Avenue, as well as at Elyria Avenue and 21st Street. Key upgrades included the installation of video detection fisheye cameras, GPS preemption systems, GPS clocking technology, and signal head replacements.
Additionally, the project required the complete removal and replacement of the traffic signal system at Elyria Avenue and West 28th Street (SR57). New foundations, poles, cabinets, and associated hardware were installed, along with jack-and-bore metal conduit, upgraded power service, and pavement marking removals and replacements.
The planned cabinet modifications and signal timing adjustments were found to be incompatible with the existing cabinets at five intersections, as they lacked the capacity to support the additional equipment and were improperly wired for the new ATC controllers. To address this, new cabinets were procured and installed, ensuring sufficient phasing to manage both vehicular and pedestrian movements. Without these upgrades, GPS preemption capabilities would have been ineffective.
The intersection at Elyria Avenue and West 28th Street posed its own set of challenges, particularly with the installation of rigid metal conduit using the jack-and-bore method, due to space constraints on the south side of the intersection. Through close collaboration with the contractor and the City of Lorain, the conduit layout was adjusted, leading to a cost-saving solution while maintaining project integrity.
KEM provided comprehensive construction inspection services to ensure strict adherence to project plans and contract requirements. Daily documentation included written logs of project activities and verification of completed quantities. KEM also oversaw subcontractor performance, ensuring compliance with DBE requirements.
Field reviews and approvals of pay requests were conducted prior to formal submittals. Additionally, KEM managed material submittals, processed change orders, and prepared cost estimates for the City's approval. Quality assurance testing was conducted to monitor concrete foundation placement and verify compliance with project specifications.



