The project also involved a road diet restriping of U.S. Route 6, extending from the SR611 Underpass to Arkansas Avenue, to accommodate new bike lanes. The road diet reduced the number of eastbound and westbound travel lanes, while maintaining a center turn lane to allow for the installation of two six-foot-wide bike lanes.
In addition to the roadway improvements, a new HAWK signal was installed on U.S. Route 6, enhancing pedestrian safety and providing direct access to Lakeview Beach. The scope also included new pavement markings, signage, and the restriping of crosswalks throughout the project corridor.
A key challenge in this project, as with similar initiatives requiring curb ramp replacements, was ensuring full compliance with Public Rights-of-Way Accessibility Guidelines (PROWAG) and Americans with Disabilities Act (ADA) standards in the new construction.
KEM provided construction inspection services to verify compliance with project plans and contract requirements. Daily written logs of project activities and verification of completed quantities ensured accurate documentation. Additionally, KEM conducted quality assurance testing of concrete to confirm adherence to specifications.
As part of the project oversight, KEM also managed material submittal approvals, change order processing, and pay estimate preparation for the City's approval, ensuring the successful execution of all contractual obligations.