Lucas Sidewalks

KEM provided design services from 2018 to 2020 for the $235,000 sidewalk extension project under the ODOT Local Let process. The Village of Lucas sponsored this 1,880-foot-long project, which involved constructing a new sidewalk in three separate sections along SR 39 within the Village of Lucas.

Lucas Sidewalks

Project Details

Client
Village of Lucas
Location
Lucas
Year
2020

The new sidewalk connected existing sidewalks to pedestrian destinations at the Village limits, including the Lucas Community Center on the west end and the Dollar General on the east end. Each section had unique characteristics, necessitating the use of access management, guardrail with a pedestrian handrail, specialty curb types for traffic separations and grading tie-ins, and drainage modifications to maintain existing facilities. KEM's services included field survey, field review, preliminary design, and final design. Special care was taken during the design phase to limit impacts on adjacent landscaping features and trees, minimize environmental and right-of-way impacts, and maintain surface drainage throughout the project.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053