Project Details
- Client
- City of Sandusky
- Location
- Sandusky
- Year
- 2020
KEM’s services included preliminary engineering, field review, and final design. The project involved the replacement of 1,020 feet of sidewalk and the installation of new and upgraded curb ramps at intersections near the city schools. Additionally, the project included the installation of solar-powered school speed limit sign assemblies with driver feedback speed limit signs and bike racks at Sandusky Middle School. Special care was taken during the design phase to limit impacts on adjacent landscaping features, including trees, and to minimize environmental and right-of-way impacts.



