Project Details
- Client
- City of Elyria
- Location
- Elyria
- Year
- Ongoing
This phase includes the installation of a jack-and-bore segment beneath State Route 57 and the construction of 23 manholes.
KEM is currently delivering design services for the second phase of a three-phase improvement program outlined in the Elyria Facility Plan. The Southeast Interceptor Sewer Project Phase 2 encompasses 7,700 linear feet of sanitary sewer ranging from 8 inches to 30 inches in diameter.
This phase includes the installation of a jack-and-bore segment beneath State Route 57 and the construction of 23 manholes.
KEM has been selected by the City of Shelby to design a roadway reconstruction project for Mickey Road, spanning from SR 61 to SR 309.
K.E. McCartney & Associates, Inc. (KEM) was engaged by the Village of Marengo to develop improvements to its sanitary system to allow for future expansion and growth.
KEM was contracted by the City of Ontario to develop construction plans for replacing their undersized 8-inch sanitary sewer, which collects flows north of State Route 30 near Lexington-Springmill Road.


