KEM was selected to provide construction administration, inspection, and field-testing services for the Vermilion Road Phase 4A project.

Vermilion Road, Phase 4A

Project Details

Client
City of Vermilion
Location
Vermilion
Year
2023

This ODOT LPA Local-Let project involved the widening and reconstruction of Vermilion Road from the City of Vermilion corporation line for approximately 0.4 miles, and the resurfacing of Vermilion Road from North Ridge Road to the City of Vermilion corporation line for approximately 0.1 miles.

The project required extensive subgrade remediation using Geotextile Fabric, Type D, and 304 Aggregate Base, along with the installation of 3,400 feet of 4-inch Base Pipe Underdrain. Roadside drainage was significantly improved through the installation of catch basins, side ditch inlets, and the re-establishment of roadside swales. Additionally, the project included the construction of a stabilized crushed aggregate berm, guardrail installation, and the implementation of new signage and pavement markings.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053