West 4th Street and Rock Road Roundabout, Ontario

KEM has been selected by the City of Ontario to design a roundabout at the intersection of West 4th Street and Rock Road. The roundabout approaches are a mix of high speed on W. 4th Street at 50 mph and low speed on Rock Road at 35 mph.

Project Details

Client
City of Ontario
Location
Ontario

The roundabout location was chosen to maximize vehicular safety on approach and through the circulatory roadway while minimizing disruption to the existing utilities and property takes from the adjacent properties. The circulatory roadway will be designed to carry cars, semi-trucks, and farm equipment as the surrounding area is a mix of residential, industrial, and agricultural. The project includes curbed approaches, splitter islands, a concrete truck apron, rolled curb and concrete truck aprons for over-tracking, and sandstone landscaping. A closed drainage system was designed to account for surface runoff that could not be directed to the open ditches. A vegetated filter strip was designed as the BMP for this project to take advantage of the existing slope embankments. This project will include roadway approach and circulatory roadway lighting with standard cobrahead roadway lighting fixtures. Traffic control was designed to meet the updated version of MUTCD. This project also included preparing right-of-way plans and acquisition of permanent rights-of-way and temporary easements from four properties.

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053