Project Details
- Client
- Environmental Design Group
- Location
- Woodmere
Over a three-month monitoring period, KEM installed seven flow meters and one rain gauge within the sanitary system, with pipe diameters of up to 15 inches. The monitoring revealed extremely slow flows and minimal depths, with little response to potential wet weather conditions.


