
Jonathan Walters
Environmental Services Coordinator · Mansfield office
Jonathan has more than 8 years of experience guiding public and private projects through environmental regulations. He runs KEM’s MS4 NPDES permit compliance program, helping communities keep their management plans and program documents current and meet Ohio EPA reporting. He also builds Survey123 inspection forms and reviews and inspects construction SWPPPs for KEM’s MS4 clients.
Featured Projects
Gerber Stream and Wetland Restoration
KEM, in collaboration with Davey Resource Group, has been contracted to design and oversee construction administration for the Gerber Stream and Wetland Restoration Project, located in Eaton Township along State Route 83.
Kingwood Center Gardens
KEM provided civil engineering services as part of the master planning for Kingwood Center Gardens, focusing on enhancing the visitor experience.
Lorain County Stormwater Management District
KEM was hired by Lorain County to develop a comprehensive stormwater program.
Foster Ditch Restoration
This project involved the restoration of 1.6 miles of ditch through the reestablishment of the cross-section and flowline grade, as well as the removal of fallen trees, debris, and structural obstructions.
City of Ontario Stormwater Program
KEM was appointed City Engineer for the City of Ontario in 2015.
Mansfield Stormwater Master Planning
KEM was contracted by the City of Mansfield to provide stormwater master planning for two flood-prone areas within the city.
Gerber Stream and Wetland Restoration
KEM, in collaboration with Davey Resource Group, has been contracted to design and oversee construction administration for the Gerber Stream and Wetland Restoration Project, located in Eaton Township along State Route 83.
Kingwood Center Gardens
KEM provided civil engineering services as part of the master planning for Kingwood Center Gardens, focusing on enhancing the visitor experience.
Lorain County Stormwater Management District
KEM was hired by Lorain County to develop a comprehensive stormwater program.
Foster Ditch Restoration
This project involved the restoration of 1.6 miles of ditch through the reestablishment of the cross-section and flowline grade, as well as the removal of fallen trees, debris, and structural obstructions.
City of Ontario Stormwater Program
KEM was appointed City Engineer for the City of Ontario in 2015.
Mansfield Stormwater Master Planning
KEM was contracted by the City of Mansfield to provide stormwater master planning for two flood-prone areas within the city.
Rocky River Stormwater Master Plan, NEORSD
As part of the Project Team for the Rocky River Stormwater Master Plan, KEM is conducting remote and physical walk-through CCTV inspections of approximately 30,000 linear feet of culverted streams which have both small and large diameter storm sewers.
Kelner Ditch Restoration, LaGrange
This project involved the restoration of 5.2 miles of ditch through the removal of fallen trees, debris, structural obstructions, and accumulated sediment.
Cuyahoga River North Stormwater Master Plan, NEORSD
KEM is part of a project team providing field services for NEORSD’s Cuyahoga River North SWMP.
City of Mansfield Stormwater Program
KEM was contracted by the City of Mansfield in 2016 to address MS4 compliance needs following a Notice of Violation issued by Ohio EPA.
Ravine’s Edge Stormwater Retrofit, LaGrange
This project focused on the enhancement of an existing stormwater management facility to incorporate water quality features in compliance with the Ohio EPA’s Small MS4 General Permit No. OHQ000004.
West Broadway Street Drainage, Plymouth
KEM was hired to undertake a drainage improvement project along 2,030 feet of West Broadway Street in the Village of Plymouth.


