Project Details
- Client
- Knox County Engineer
- Location
- Knox County
- Year
- 2024
- Status
- Completed
- Photos
- 7 photos ↓
Over 1,000 feet of existing asphalt roadway was removed, and a new roadway was constructed to connect to the new bridge. Additionally, over 2,500 feet of piling was driven for both the abutments and two piers located in the river.



