Project Details
- Client
- Crawford County
- Location
- Crawford County
- Year
- 2026
- Status
- Completed
- Photos
- 22 photos · 1 video ↓
The existing structure was a 3-span continuous reinforced concrete slab on full height abutments. The new bridge was a 3-span continuous reinforced concrete slab (24” thick) on semi-integral abutments on drilled shafts with wall type piers on spread footings. Sleeper slabs and approach slabs were installed to enhance pavement longevity and improve ride quality.



