Bellville Sidewalk, Phase 1

KEM provided design services from 2018 to 2020 for the $310,000 sidewalk extension project under the ODOT Local Let process.

Bellville Sidewalk, Phase 1

Project Details

Client
Village of Bellville
Location
Bellville
Year
2021
Status
Completed

The Village of Bellville sponsored this 600-foot-long sidewalk project, which begins at the existing bridge over the Clear Fork Mohican River and extends north along the east side of SR 13 and the south side of SR 97. This project is an extension of the Downtown Bellville Streetscape project and includes access management, decorative lighting, paver bricks, new trees, and ADA-compliant curb ramps. Additionally, the project involved the installation of a new storm system, new curbing, and the abandonment of existing soil contamination monitoring wells. KEM’s services included field survey, field review, preliminary design, final design, and right-of-way acquisition services for three parcels.

Project Photos

Phase 2 9 photos
  • Bellville Sidewalk, Phase 1, Phase 2, photo 1 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 2 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 3 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 4 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 5 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 6 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 7 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 8 of 9
  • Bellville Sidewalk, Phase 1, Phase 2, photo 9 of 9
Phase 1 11 photos
  • Bellville Sidewalk, Phase 1, Phase 1, photo 1 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 2 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 3 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 4 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 5 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 6 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 7 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 8 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 9 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 10 of 11
  • Bellville Sidewalk, Phase 1, Phase 1, photo 11 of 11

Related Projects

Have a Project in Mind?

Tell us what you're planning

KEM's Mansfield office
Headquarters

Mansfield

52 N. Diamond Street
Mansfield, Ohio 44902
KEM's Elyria office

Elyria

526 E. Broad Street
Elyria, Ohio 44035
KEM's Lorain office

Lorain

5065 Oberlin Avenue
Lorain, Ohio 44053